The Acemco project was a unique challenge because the building’s infrastructure needed to support the weight of large cranes, as well as accommodate the heavy energy requirements needed to operate their equipment and house their corporate offices. We addressed these needs by installing thick concrete floors to support the equipment and by working with local utility contractors to meet the client’s power requirements.
The office space is an inviting space for employees to work, as well as to host customers and vendors. Westwind worked with the client to install custom cherry wood details and windows which highlight the beautiful green space surrounding their building.
This project is a testimony to the value we place in investing in long-term relationships with our clients. As our client’s needs change, we are here to walk alongside them to ensure their space continues to function for them for years to come.
- Address: (Hangar) 166 Ellis Road, Norton Shores; (Corporate Office) 7297 Enterprise Drive, Spring Lake
- Function: Industrial Space, Office Space, Airplane Hangar
- Date: 2000 (Headquarters); 2001 (Hangar); 2008 (Addition)
- Size: Headquarters: 104,750 square feet; Hangar: 8,000 square feet; Addition: 40,000 square feet
“We recently work with Westwind Construction at the site of a large and longtime customer of ours. The installation of our water recycling and filtration system requires a significant amount of attention to detail during the planning stages, at the site prior to our installation, in addition to coordinating 2 -3 trades to complete their work, so we can complete our work. We were pleased to find that when we arrived on site that the site prep was spot on and the coordination of all the different trades to complete our work came together like a well-oiled machine!
Westwind Construction’s work allowed us to experience one of the smoothest installations – especially on such a large job. Their communication prior to our to ensure that the various trades knew exactly what was required of them and their design of the facility overall was one of the best we have seen. It was a pleasure to work with such an organized and professional group!”
–Steve Sicard, Project Manager, Water Treatment Solutions
-